Drip Irrigation Conversion for Improved Water Efficiency
Darling Irrigation Leeton designed and installed a new drip irrigation system across approximately 15.5 hectares, replacing an existing overhead sprinkler network to improve water efficiency, fertigation capability and irrigation performance.
Project overview
The project involved converting an established irrigation area from overhead sprinklers to drip irrigation. The new system combined pumping, filtration, pipeline infrastructure, fertigation equipment and automated controls to support more precise water and nutrient delivery.
Darling Irrigation Leeton managed the design and installation, coordinating equipment supply and on-site works around the grower’s ongoing irrigation requirements.
The challenge
Installation took place during warm weather, with the property relying on a single water source for irrigation. Maintaining the grower’s access to water throughout the conversion was essential.
Careful planning and project management were required to coordinate the changeover while minimising disruption to irrigation schedules and day-to-day farm operations.
The solution
Darling Irrigation Leeton delivered an integrated drip irrigation system comprising:
Rivulis filtration systems and drip irrigation tube
AMIAD Mini Sigma automatic filters for backup field filtration
Grundfos pumping equipment
A Polymaster fertigation mixing tank
Iplex PVC pipeline infrastructure
Bermad field valves for irrigation control and automation
A Mait Automation control system
The system was designed to improve control over irrigation and fertigation, with equipment selected to work together across the 15.5-hectare area. Installation was carefully coordinated to maintain access to the existing water supply during the conversion.
The result
The completed project replaced the overhead sprinkler network with a new drip irrigation system, providing the grower with infrastructure designed for more efficient water use, improved fertigation capability and greater control over irrigation.
Careful coordination helped maintain water access throughout the works and minimise disruption during a challenging period of warm weather.